Catalpa-Pershing Bridge Progress

First piece out of the glaze kiln!!


I bet you are wondering how the tile panels for the bridge are coming along.  The answer is: GREAT! We have finished building the eight vertical panels and the first ones are out of the glaze firing.  The colors are more rich and vibrant than we could have hoped for, and boy do they sparkle in the sun!













Forms with foam inserts for tile panels



Meanwhile, the constructions of the bridge itself is coming right along. San Antonians will be happy to know that the Mulberry is scheduled to be open to traffic,  with bridge construction finished by first week in April. (disclaimer: neither Diana Kersey  nor her assistant are responsible for any of the current or future traffic situations in San Antonio)







Exterior of bridge with scaffolding! 
We have built twelve out of sixteen of the horizontal panels.  Only four more to go.  We are now focusing on processing all of the exterior panels though the glazing and firing process.  The artisan construction workers at Hill Country Bridge, Inc.http://www.facebook.com/pages/Hill-Country-Bridge-Inc are leaving the exterior scaffolding up for us.  We don't have to install hanging off the side of the bridge with rock climbing harnesses!!!!






Peek at unglazed exterior horizontal panels 
 We can't wait for you all to see it installed.

Sara Boyd